The log cabin home renovation continues. Dry wall is up and painting has begun. As the interior walls are put up the beauty of the exposed beams is an essential design element adding warmth, interest and a raw, natural surrounding.
The bathrooms are shaping up nicely as well. Tile has been installed and grouted in the master bathroom shower and the home owners have chosen to go with a unique metal look for the second bathroom shower. New wooden floors are being installed throughout the home, sanded and prepared for staining.
Next steps are to finish the walls, install light fixtures and start the kitchen buildout.